Upon completion, it is anticipated that the Severnside Energy Recovery Centre will be capable of processing up to 400,000 tonnes of non-recycled waste, with capacity to generate up to 34MW of electricity (the equivalent of powering 50,000 homes). The concept, which has been developed over the past 10 years, will also generate heating for the entire building.
Being delivered by owner Sita UK, the facility will provide new treatment and recovery operations to manage residual household waste from West London, which will arrive by rail.
Requirement for BEMS
Initially, SCS Group was brought in to provide the BEMS that would operate the heating, chilled and hot water systems, ventilation and five air-handling unit (AHU) plants, with every office having independent FCU (fan coil unit) control for user comfort. SCS Group was appointed by M&E contractor VVB Engineering, working for main construction contractor Sir Robert McAlpine, which in turn is carrying out the work for its client Hitachi Zosen Inova AG, a specialist in ‘energy from waste’ projects.
From its facility in Cardiff supporting Wales and the West, SCS Group recommended the use of Priva Blue ID for this landmark project.